Research Article
Malmquist–Luenberger Productivity Index for a Two-Stage Structure in the Presence of Undesirable Outputs and Uncertainty
Table 12
MPI for the overall process and the first and the second stages.
| DMUs | Overall process 2020-2021 | First stage 2020-2021 | Second stage 2020-2021 | EC | TC | MPI | EC | TC | MPI | EC | TC | MPI |
| 1 | 0.619 | 1.042 | 0.645 | 0.724 | 4.155 | 3.008 | 0.238 | 45.667 | 10.869 | 2 | 1.000 | 1.170 | 1.170 | 1.000 | 1.000 | 1.000 | 1.000 | 1.993 | 1.993 | 3 | 0.858 | 1.365 | 1.171 | 0.594 | 0.847 | 0.503 | 0.845 | 1.114 | 0.941 | 4 | 0.518 | 2.107 | 1.091 | 0.901 | 1.054 | 0.950 | 0.456 | 9.587 | 4.372 | 5 | 0.617 | 1.408 | 0.869 | 0.638 | 1.252 | 0.799 | 0.623 | 1.471 | 0.916 | 6 | 0.857 | 2.155 | 1.847 | 0.876 | 0.319 | 0.279 | 1.353 | 0.860 | 1.164 | 7 | 0.789 | 0.492 | 0.388 | 0.809 | 0.537 | 0.434 | 1.025 | 0.988 | 1.013 | 8 | 0.769 | 1.315 | 1.011 | 0.698 | 1.197 | 0.836 | 1.438 | 0.163 | 0.234 | 9 | 0.852 | 1.416 | 1.206 | 1.036 | 1.729 | 1.791 | 1.219 | 4.134 | 5.039 | 10 | 0.714 | 3.858 | 2.755 | 0.738 | 0.612 | 0.452 | 0.783 | 2.765 | 2.165 | 11 | 0.851 | 1.108 | 0.943 | 0.637 | 2.938 | 1.872 | 0.871 | 0.529 | 0.461 |
| Average | 0.768 | 1.585 | 1.191 | 0.786 | 1.422 | 1.084 | 0.896 | 6.297 | 2.652 |
|
|