Research Article
Feasibility Study of a Hybrid PV/Hydro System for Remote Area Electrification in Rwanda
Table 1
Technical information for Mutobo hydropower station.
| | Parameters | Values at Mutobo power station |
| | Penstock length (m) | 223 | | Hydraulic head H (m) | 123.30 | | Designed flow rate 90% (m3s−1) | 0.932 | | Installed power capacity (kW) | 200 | | Annual energy generation (MWh) | 1749.8 | | Actual power potential (ηo = 80%) (kW) | 196 | | Turbine type | Francis | | Turbine efficiency (%) | 65 |
|
|