Research Article

Evaluation of Worker Radiation Exposure during the Kori Unit 1 Steam Generator Dismantling Process

Table 9

Worker radiation exposure during SG dismantling in 2027.

WorkRadiation exposure (man-mSv)

Install temporary auxiliary crane1.42 × 10−1
Install temporary lifting device of SG2.84 × 100
Install rail and transportation cart8.35 × 10−1
Install protection plate4.26 × 10−1
Remove SG thermal insulation3.19 × 10−1
Transport SG thermal insulation2.84 × 10−1
Cut main steam pipe2.84 × 10−1
Cut main water supply pipe1.4 × 10−1
Cut others pipe3.2 × 10−1
Cut cold leg pipe9.4 × 10−1
Cut hot leg pipe1.00 × 100
Total7.53 × 100

SG: steam generator.