Design Change and Operational Consideration of the HVAC System during Nuclear Power Plant Decommissioning
Table 2
Design considerations for decommissioning.
| System | Remove | Maintenance | New installation |
| RCB HVAC and purge | RCFC (2 EA), CEDM cooling fan, reactor cavity fan | RCFC (2 EA), SG enclosure R/C fan, annulus area R/C fan, all of purge system, ESFAS or alternative | Portable temporary HVAC units, air discharge and intake duct for RCB purge system on each floor, duct for portable temporary HVAC units | FHB HVAC | ā | All system, ESFAS | ā | MCR HVAC | Supply AHU (1 train), emergency make up ACU (2 trains), smoke removal fan, MCR recirculation duct, ESFAS | Supply AHU (1 train), exhaust fan | Temporary HVAC units |
|
|