Design Change and Operational Consideration of the HVAC System during Nuclear Power Plant Decommissioning

Table 2

Design considerations for decommissioning.

SystemRemoveMaintenanceNew installation

RCB HVAC and purgeRCFC (2 EA), CEDM cooling fan, reactor cavity fanRCFC (2 EA), SG enclosure R/C fan, annulus area R/C fan, all of purge system, ESFAS or alternativePortable temporary HVAC units, air discharge and intake duct for RCB purge system on each floor, duct for portable temporary HVAC units
FHB HVAC—All system, ESFAS—
MCR HVACSupply AHU (1 train), emergency make up ACU (2 trains), smoke removal fan, MCR recirculation duct, ESFASSupply AHU (1 train), exhaust fanTemporary HVAC units