Research Article
Optimizing Reservoir-Stream-Aquifer Interactions for Conjunctive Use and Hydropower Production
Table 1
Parameters associated with the streams, lake, and aquifer.
| | Parameters | Values |
| | Reservoir/lake | | | Area | 2.3 × 106 m2 | | Capacity | 42 × 106 m3 | | Cutoff elevation | 29.5 m | | Turbine elevation | 20.0 m | | Initial stage | 29.0 m | | Diversion channel capacity | 14115 m3/day | | Penstock Capacity (release to hydropower) | 200,000 m3/day | | Hydraulic Conductivity of lakebed | 0.04 m/day | | Thickness of lakebed sediment | 0.9 m |
| | Streams | | | Width | 9.1 m | | Thickness of streambed sediment | 0.3 m | | Slope of streambed segments | 0.0002 | | Hydraulic conductivity of streambed sediment | 0.04 m/day | | Manning’s roughness coefficient | 0.02 | | Streambed conductance | 180 m2/day |
| | Stream inflow to lake | | | Total length | 6090 m | | Inflows in stress period 1 | 225840 m3/day | | Inflows in stress period 2 | 56460 m3/day | | Inflows in stress period 3 | 112920 m3/day |
| | Stream outflow from lake | | | Total length | 2435 m | | First diversion channel capacity | 8750 m3/day | | Second diversion channel capacity | 14115 m3/day |
| | Aquifer | | | Hydraulic conductivity of unconfined layer | 61 m/Day | | Specific yield of the unconfined layer | 0.15 | | Transmissivity of the confined layer | 371 m2/day | | Storage coefficient of the confined layer | 0.0001 | | Ratio of horizontal to vertical hydraulic conductivity | 100 | | Groundwater recharge | 0.8 × 10−3 m/day | | Precipitation rate | 2.2 × 10−3 m/day | | Evaporation rate | 1.74 × 10−3 m/day |
| | Irrigated field | m2 |
|
|