Research Article

Shear Stress Analysis and Crack Prevention Measures for a Concrete-Face Rockfill Dam, Advanced Construction of a First-Stage Face Slab, and a First-Stage Face Slab in Advanced Reservoir Water Storage

Figure 16

Shear stress in the concrete face under condition 2 with the water level at 3283 m (units: MPa).