Model test conditions for Scheme 3.

Condition numberCondition description

1Read initial value
2Excavate to −133 mm depth
3Tension of the first layer of anchor cable
4Excavate to −266 mm depth
5Excavate to −400 mm depth
6Tension of the second layer of anchor cable
7Excavate to −533 mm depth
8Excavate to −666 mm depth
9Tension of the third layer of anchor cable
10Excavate to −800 mm depth
11Excavate to −933 mm depth
12Excavate to −1000 mm depth
13Remain stationary after excavation completion
14Load the mat foundation
15Load first layer of weights
16Load second layer of weights
17Load third layer of weights
18Load fourth layer of weights
19Load fifth layer of weights
20Load sixth layer of weights
21Load seventh layer of weights
22Remain stationary after loading completion