Research Article
Impact of High-Rise Buildings Construction Process on Adjacent Tunnels
Table 7
Numerical simulation conditions for Scheme 3.
| Condition number | Condition description |
| 1 | Initial stress state, clear displacement field | 2 | Completion of shield tunnel, clear displacement field | 3 | Excavate to −2.0 m depth | 4 | Completion of the first layer of anchor cable | 5 | Excavate to −4.0 m depth | 6 | Excavate to −6.0 m depth | 7 | Completion of the second layer of anchor cable | 8 | Excavate to −8.0 m depth | 9 | Excavate to −10.0 m depth | 10 | Completion of the third layer of anchor cable | 11 | Excavate to −12.0 m depth | 12 | Excavate to −14.0 m depth | 13 | Excavate to 15.0 m depth | 14 | Completion of mat foundation | 15 | Completion of basement floors −4 and −3 | 16 | Completion of basement floors −2 and −1 | 17 | Completion of building floors 1 and 2 | 18 | Completion of building floors 3 and 4 | 19 | Completion of building floors 5 and 6 | 20 | Completion of building floors 7 and 8 | 21 | Completion of building floors 9 and 10 |
|
|