Research Article
Risk Assessment of Resources Factor in Affecting Project Time
Table 15
Ten potential rankings in all three periods.
| Risk factors | Variable code | Period I | Period II | Period III | Top ten variables in all periods | RII | Rank | RII | Rank | RII | Rank |
| Labor | A1 | 0.434 | 1 | 0.365 | 2 | 0.268 | 5 | 1 | Material | B2 | 0.425 | 2 | 0.276 | 7 | 0.290 | 2 | 2 | Labor | A2 | 0.407 | 3 | 0.407 | 1 | 0.279 | 3 | 3 | Labor | A3 | 0.366 | 5 | 0.332 | 3 | 0.297 | 1 | 4 | Equipment | C10 | 0.333 | 6 | 0.240 | 10 | 0.251 | 8 | 5 | Equipment | C9 | 0.332 | 7 | 0.250 | 9 | 0.234 | 9 | 6 | Labor | A4 | 0.326 | 8 | 0.314 | 4 | 0.252 | 7 | 7 | Equipment | C5 | 0.304 | 9 | 0.311 | 5 | 0.274 | 4 | 8 | Material | B1 | 0.294 | 10 | 0.284 | 6 | 0.268 | 6 | 9 | Material | B3 | 0.288 | 12 | 0.222 | 11 | 0,222 | 10 | 10 |
|
|