Research Article

Bridge Responses Induced by Adjacent Subway Station Construction Using Shallow Tunneling Method

Table 4

Absolute height value of the pier top (unit: m).

Monitoring items1st loading2nd loading3rd loading4th loadingUnloading

#8-10.320.490.410.500.47
#8-20.250.420.300.320.41