Research Article

Temperature Control Measures and Temperature Stress of Mass Concrete during Construction Period in High-Altitude Regions

Figure 7

Distribution diagram of the basic conditions and temperature control measures for dam: (a) distribution of the basic temperature control measures and (b) cooling mode (the lower three grouting zones should be cooled simultaneously).
(a)
(b)