Research Article

Temperature Control Measures and Temperature Stress of Mass Concrete during Construction Period in High-Altitude Regions

Table 6

Calculated results of temperature and stress according to the schemes.

Operating conditionMaximum temperature of the strongly restrained zone (°C)Maximum tensile stress of the strongly restrained zone
σx (MPa)Elevation (m)Safety coefficient k

Scheme 127.541.403264.51.81
Scheme 228.721.453264.51.74
Scheme 327.541.483264.51.71
Scheme 427.541.493264.51.70