Research Article
Estimation of Time-Averaged Shear Wave Velocity (SWV) to 30 m considering Site SWV Structural Characteristic
Figure 4
Distribution of residual VS30 with βH. (a) Japan, H = 10 m. (b) Japan, H = 15 m. (c) Japan, H = 20 m. (d) Japan, H = 25 m. (e) California, H = 10 m. (f) California, H = 15 m. (g) California, H = 20 m. (h) California, H = 25 m.
(a) |
(b) |
(c) |
(d) |
(e) |
(f) |
(g) |
(h) |