Research Article
Developing Shuffled Frog-Leaping Algorithm (SFLA) Method to Solve Power Load-Constrained TCRTO Problems in Civil Engineering
Table 1
Optimization parameters and methods for the project scheduling problem.
| | Research studies | Optimization parameters | Optimization method | | Time | Cost | Resource fluctuation | Quality | Cash flow | Resource availability | Site layout | Productivity | Safety |
| | [11] | √ | √ | | | | | | | | PSO | | [12] | √ | √ | | | | | | | | ACA | | [4] | √ | | √ | | | √ | | | | Commercial planning software | | [13] | √ | √ | | | | √ | | | | GA | | [14] | | | √ | | | √ | | | | GA | | [15] | √ | √ | √ | | | | | | | GA (NSGA II) | | [10] | √ | √ | √ | | | | | | | SFLA | | [16] | | √ | √ | | | √ | | | | IP | | [17] | | | √ | | | | | | | BCA | | [18] | √ | √ | | √ | | √ | | | | GA and evidential reasoning | | [19] | | | √ | | | √ | | | | Evolutionary algorithm | | [5] | √ | √ | √ | | | | | | | GA (NPGA) | | [8] | √ | √ | √ | | | √ | | | √ | GA | | [20] | √ | | | | | √ | | √ | | Metaheuristics | | [6] | | √ | | | | | √ | | √ | GA | | [21] | √ | √ | √ | | √ | √ | | | | NSGA II | | [22] | √ | √ | | | | √ | √ | | | GA |
|
|