Research Article
A Method for Determining the Capacity of an Exclusive Left Lane with a Permitted Phase under Nonstrict Priority
Table 1
Description of field sites.
| | 
 |  | Intersection | Approach | Cycle length (seconds) | Number of surveyed cycles | Extension distance (meters) | Maximum volume of a left-turn group (pcu) |  | 
 |  | Feiyue rd.-Dongfeng str. | E. | 155 | 20 | 10 | 4 |  | W. | 155 | 20 | 15 | 5 |  | Heping rd.-Haoyue str. | N. | 140 | 52 | 19 | 6 |  | S. | 140 | 52 | 21 | 8 |  | W. | 140 | 52 | 23 | 7 |  | E. | 140 | 52 | 27 | 8 |  | Jianshe str.-Bei’an rd. | E. | 130 | 30 | 16 | 5 |  | W. | 130 | 30 | 16 | 5 |  | Tongzhi str.-Chaoyang rd. | W. | 133 | 30 | 16 | 5 |  | E. | 133 | 30 | 16 | 6 |  | Tongzhi str.-Zhonghua rd. | W. | 133 | 30 | 19 | 6 |  | E. | 133 | 30 | 19 | 7 |  | Tongzhi str.-Xi’an rd. | S. | 175 | 20 | 36 | 9 |  | Tongzhi str.-Ziyou rd. | N. | 187 | 30 | 19 | 6 |  | S. | 187 | 30 | 20 | 7 |  | Zhuhai rd.-Huizhan str. | N. | 105 | 35 | 15 | 5 |  | E. | 105 | 35 | 17 | 6 |  | S. | 105 | 35 | 17 | 6 |  | W. | 105 | 35 | 20 | 7 |  | 
 | 
 |