Research Article

A Multistep Method for Automatic Determination and Optimization of Microseismic P-Phase Arrival Times in a Coal Mine

Table 1

Station layout parameters.

Sensor coordinates (m)
Station number (#)X axialY axialZ axialStation location

1438.82389.3−191.49Haulage roadway
2446.95360.04−184.306Haulage roadway
3454.68333.56−178.669Haulage roadway
4463.56303.22−174.108Haulage roadway
5471.99275.47−166.204Haulage roadway
6481.08247.3−162.075Haulage roadway
7572.29387.38−186.378Ventilation roadway
8598.85301.87−172.128Ventilation roadway
9590.08329.94−175.486Ventilation roadway
10598.85301.87−172.128Ventilation roadway
11607.09272.79−166.429Ventilation roadway
12616.86244.66−160.446Ventilation roadway