Research Article

An Effective Approach to Input Variable Selection for Preliminary Cost Estimation of Construction Projects

Table 5

The weight of input variables with respect to the variable group (V2).

Input variable (VIJ)Fuzzy weightCrisp weight (BNP)

Existence of groundwater
Bridge type
Number of bridges