Research Article

BIM-Based Digital Fabrication Process for a Free-Form Building Project in South Korea

Table 2

List of prefabricated components.

PartEALength/areaDuration (month)Daily output (EA)

Secondary structure3,1158,855.87 m271.20
T-BAR3,5429,581.01 m353.67
Form plate3,4359,640.41 m352.05
Reveal1,6193,339.88 m324.53
NT panel (10T)17,9438,181.49 m2 (curved surface, plane, aperture)4203.80
Edge panel (1.6T)80250.13 m0.57.27