Summary of construction activities.
| | Stage number | Activity |
| | 1 | Wall was installed | | 2 | Zone 1# was excavated to the second support | | 3 | Zone 1# was excavated to the base | | 4 | Zone 2# was excavated to the second support, and the partition wall was removed accordingly | | 5 | Zone 2# was excavated to the base, and the partition wall above the base was removed |
|
|