Research Article
Scenario-Planning Method for Cost Estimation Using Morphological Analysis
Table 3
Cost proportion analysis (interior finishing works).
| | Interior finishing work | | Items | Cost proportion | Percentage rank |
| | Gypsum boards | 0.1% | 11 | | Ceiling boards | 7.0% | 4 | | Floorboards | 54.2% | 1 | | Wall finishes | 8.2% | 3 | | Ceiling finishes | 3.6% | 8 | | Moldings | 3.7% | 7 | | Dry partitioning | 2.4% | 9 | | Insulation board | 4.8% | 5 | | Internal insulation | 3.9% | 6 | | Acoustic board | 1.4% | 10 | | CRC board | 10.7% | 2 |
|
|
Cellulose fiber-reinforced concrete board. |