Research Article

Study on the Evaluation Method of Green Construction Based on Ontology and BIM

Table 9

Evaluation result.

NumberSpecific indicator contentIndicator valuesScores

1Dust control: visual inspection of the fugitive dust height in the earthwork area (m)1.51
2Ambient noise at daytime (dB)651
3Suspended solid content in sewage water (mg/L)3001
4Difference between monthly average total suspend particulate (TSP) on site and the city back ground value (mg/m3)0.0652
5Recycle and recovery ratio of construction wastes (%)150
6Reuse ratio of field temporary housing and retaining wall material (%)401
7Reuse ratio of unconventional water and recycled water (%)452
8Illumination should not exceed the percentage of the minimum illumination (%)201
9Equip ratio of water-saving devices in administrative area and living quarters on site (%)801
10Ratio of energy-saving lightings (%)953
11Ratio of reusable partition walls (%)602
12Ratio of prefabricated parts (%)352
13Ratio of premixed mortar to building mortar (%)651
14Ratio of ordinary rebar with higher grades than 400 MPa (%)451
15Lost rate of reinforcement field processing (%)32
16Usage of tool type combination formwork (%)802