Dynamic Response Analysis of Lateral Impact Force of Frame Wharf with Rock-Socketed Piles in Inland River Steel Sheath

Table 3

Maximum lateral displacement and response time of key points of structures.

NameWorking condition 1Working condition 2Working condition 3Working condition 4Working condition 5

Maximum out-of-river displacement of top joints of structuresSize (×10−3 m)0.9101.5770.7130.5910.440
Response time (s)1.05s1.05s1.05s1.05s1.05s

Maximum river-oriented displacement of top joints of structuresSize (×10−3 m)0.05280.08110.04460.03950.0331
Response time (s)2.3s2.3s2.3s2.3s2.3s

Maximum offshore displacement of impacted jointsSize (×10−3 m)0.8971.5552.7002.7942.991
Response time (s)1.05s1.05s1.05s1.05s1.05s

Maximum riverward displacement of impacted jointsSize (×10−3 m)0.04420.07510.1130.1150.118
Response time (s)2.3s2.3s2.3s2.3s2.3s