Research Article

Effects of Water Immersion on the Adhesion between Adhesive Layer and Concrete Block

Figure 11

Typical FEM results of the moisture content distribution: (a) 2 weeks, (b) 4 weeks, and (c) 6 weeks.
(a)
(b)
(c)