Research Article

Comprehensive Evaluation of China’s Prefabricated Decoration Cost Based on Analytic Hierarchy Process

Table 3

Factors affecting the cost of prefabricated decoration.

First-grade indicatorLevel II indicator

Design phase (Y1)Assembly style (X11)
Assembly scale ()
Assembly rate ()
Rationality of component separation ()
Repeating utilization factor ()

Production phase (Y2)Raw material cost ()
Production costs (labor and water and electricity consumption) ()
Production engineering ()
Factory amortization fee ()
Factory profit

Transportation phase (Y3)Traffic expense ()
Packing charges ()
Loading and unloading fees ()
Storage costs ()

Construction phase (Y4)Installation labour costs ()
Installation of accessories ()
Machinery costs ()
Amortization of special tools ()

Operation and maintenance phase (Y5)Household type change cost ()
Cost of hydropower pipeline changes ()
Cost of water and electricity pipeline maintenance ()
Demolition and waste removal costs ()