Research Article
Comprehensive Evaluation of China’s Prefabricated Decoration Cost Based on Analytic Hierarchy Process
Table 3
Factors affecting the cost of prefabricated decoration.
| First-grade indicator | Level II indicator |
| Design phase (Y1) | Assembly style (X11) | Assembly scale () | Assembly rate () | Rationality of component separation () | Repeating utilization factor () |
| Production phase (Y2) | Raw material cost () | Production costs (labor and water and electricity consumption) () | Production engineering () | Factory amortization fee () | Factory profit |
| Transportation phase (Y3) | Traffic expense () | Packing charges () | Loading and unloading fees () | Storage costs () |
| Construction phase (Y4) | Installation labour costs () | Installation of accessories () | Machinery costs () | Amortization of special tools () |
| Operation and maintenance phase (Y5) | Household type change cost () | Cost of hydropower pipeline changes () | Cost of water and electricity pipeline maintenance () | Demolition and waste removal costs () |
|
|