Research Article
Excavation Sequence and Surrounding Rock Mass Stability of Large-Scale Underground Engineering with 8 Tunnels
Figure 6
Measuring displacement curves of tunnels #1 and #2 under different IESs: (a) top point on tunnel #1, (b) sidewall point on tunnel #1, (c) top point on tunnel #2, and (d) sidewall point on tunnel #2.
| (a) |
| (b) |
| (c) |
| (d) |