Research Article
Train Moving Load-Induced Vertical Superimposed Stress at Ballasted Railway Tracks
Table 1
Database of railway geometric parameters in China and France.
| Site | Year (y) | Axle load (t) | Track type (kg/m) | Type of ties | L (m) | B (m) | Ballast type | Dmax (m) | hB (m) | φB (°) | h2 (m) | φ2 (°) | Reference |
| Orleans-Montauban railway | 2014 | 25 | | Concrete | 1.3 | 0.3 | Gravel | 0.06 | 0.5 | 541 | 0.4 | 371 | Lamas-lopez et al. [26] | 10.5 | Zhang et al. [8] | Qin-Shen passenger rail line | Section 1 | | | | | | | | | | | 0.4 | | | Section 4 | 2002 | 14.5 | 60 | Concrete | 1.1 | 0.28 | Gravel | 0.06 | 0.35 | 521 | 0.4 | 251 | Nie et al. [45] | Section 2 | | | | | | | | | | | 0.6 | | | Da-Qin railway | 2004 | 25 | 75 | Concrete | 1.0 | 0.26 | Gravel | 0.075 | 0.45 | 501 | 3 | 301 | Zhao [46] | Guangzhou-Shenzhen | 1994 | 22.5 | 60 | Concrete | 1.3 | 0.27 | Gravel | 0.048 | 0.45 | 482 | | | Li [43] | Beijing circuit railway | 1993 | 22.5 | 60 | Concrete | 1.2 | 0.26 | Gravel | 0.06 | 0.35 | 542 | | | Li [43] | Han and Zhang [42] | Xiaoshan-Ningbo | 2000 | 22.5 | 60 | Concrete | 1.2 | 0.27 | Gravel | 0.06 | 0.45 | 492 | | | Han and Zhang [42] | Jinan-Qingdao | | 23 | | Concrete | 1.1 | 0.29 | Gravel | 0.05 | 0.45 | 492 | | | Liu and Xiao [44] | Tianjin-Pukou | | 14 | | Concrete | 1.3 | 0.29 | Gravel | 0.05 | 0.6 | 532 | | | Liu and Xiao [44] | Haerbin-Beian | | 19.6 | 43 | Concrete | 1.3 | 0.26 | Gravel | 0.06 | 0.4 | 452 | | | Li [43] | Hangzhou-Nanchang | | 20.1 | 43 | Concrete | 1.3 | 0.26 | Gravel | 0.06 | 0.4 | 532 | | | Li [43] | 20 | 43 | 442 | Li [43] |
|
|
1Compiled from the literatures. 2Estimated by equation ( 6). |