Research Article

Concrete Creep Analysis Method Based on a Long-Term Test of Prestressed Concrete Beam

Table 4

The original value and adjusted value of the parameters.

Parametersαc1αc2αc3αc4αc5αc6αc7

fib MC 2010Original0.132.01.01.91.00.350.221%
Adjusted0.142.00.82.21.30.60.086%