Research Article
Real-Time Optimization of Precast Concrete Component Transportation and Storage
Table 4
Position and on-site transportation time in the third period.
| Hoisting sequence | Type | Hoisting location | On-site transportation time (minutes) | Relocation time | Zone | Bay | Layer |
| 1 | pcb-20 | 1 | 1 | 2 | 6.13 | 0 | 2 | pcb-33 | 2 | 2 | 1 | 6.29 | 0 | 3 | pcb-33 | 2 | 2 | 2 | 6.29 | 0 | 4 | pcb-41 | 2 | 2 | 3 | 6.29 | 0 | 5 | pcb-31 | 2 | 2 | 4 | 6.29 | 0 | 6 | pcb-32 | 1 | 2 | 3 | 6.13 | 0 | 7 | pcb-29 | 2 | 2 | 6 | 11.29 | 1 | 8 | pcb-30 | 3 | 2 | 1 | 6.53 | 0 | 9 | pcb-17 | 3 | 1 | 2 | 6.53 | 0 | | | | | Total | 61.77 | 1 |
|
|