Research Article
Technical Advances of Temporary Facilities for the Failure Prevention of Large-Span Cantilever Casting Construction of Mountainous Concrete Box-Type Arch Bridges
Figure 13
Effects of the rectified short prestressed tendon scheme for improvement of the safety reserve of the no. 10 segment. (a) No. 10 segment upper edge without prestressing. (b) No. 10 segment upper edge with prestressing.
(a) |
(b) |