Research Article

Technical Advances of Temporary Facilities for the Failure Prevention of Large-Span Cantilever Casting Construction of Mountainous Concrete Box-Type Arch Bridges

Table 6

Efficacy promotion of the new techniques applied in the Shatuo Bridge (unit: MPa).

Cantilever castingTraditional manner (day)Stretch saving (day)Traveler saving (day)New techniques (day)Cost saving (104 RMB)

One segment10∼120.5∼18∼104∼7
Total (2∼18#)170∼2048.5∼178.5∼17136∼170136∼238