Research Article
Calculation of Friction Force for Slurry Pipe Jacking considering Soil-Slurry-Pipe Interaction
Table 4
The general geotechnical parameters.
| Soil group | γ (kN/m3) | φ (°) | c (kPa) | Es (MPa) | | e |
| Gravel | 18.7∼22.8 | 33∼45 | 0 | 14∼42 | 0.15∼0.25 | 0.28∼0.62 | Sand | 19∼20.5 | 28∼42 | 0 | 10∼46 | 0.25∼0.35 | 0.31∼1.27 | Clayey sand | 19.5∼21 | 13∼30 | 2∼7 | 11∼23 | 0.30∼0.40 | 0.41∼1.96 | Sandy clay | 18∼21 | 17∼24 | 5∼40 | 9∼45 | 0.25∼0.35 | 0.80∼2.24 | Clay | 17.5∼19 | 15∼18 | 25∼65 | 14∼28 | 0.25∼0.42 | 1.00∼2.50 |
|
|