Research Article

Factor’s Influence Analysis of Frost Heave during the Twin-Tunnel Construction Using Artificial Horizontal Ground Freezing Method

Table 1

Model design table.

Buried depth (m)Clear distance
0.25 D1.00 D1.50 D2.00 D2.50 D3.00 D

6Model 6-1Model 6-2Model 6-3Model 6-4Model 6-5Model 6-6
12Model 12-1Model 12-2Model 12-3Model 12-4Model 12-5Model 12-6
18Model 18-1Model 18-2Model 18-3Model 18-4Model 18-5Model 18-6