Research Article
Field Test Study of the Artificial Ground-Freezing Method Subsurface Excavation Construction of Watered Sandy Stratum in Collapsible Loess Area
Figure 6
Nephograms of the frost-heaving displacement after the cross passage excavation displacement calculation (unit: m): (a) Y-direction, (b) Z-direction, and (c) X-direction.
(a) |
(b) |
(c) |