Research Article

Surface Subsidence Control during Deep Backfill Coal Mining: A Case Study

Table 2

Parameters for surface movement induced by fully caving coal mining.

NumberMeasuring lineWorking areaWidth (m)Gap (m)Thickness (m)Stopping timeObservation times relative error (%)

1East-west measuring line in working area 130113012152202.77∼3.452005.10∼2006.112005.12∼2008.110.522.100.460−0.36
13022102203.672006.12∼2007.082005.12∼2008.110.652.150.4900.84

2South-north measuring line in working area 130213022102203.672006.12∼2007.82007.01∼2009.050.532.300.7630/0.032H−0.58

3South-north measuring line in working area 130413041501304.972008.01∼2008.112008.08∼2009.100.442.050.345/0.05H−0.52

4South-north measuring line in working area 130513051301303.45∼6.52010.08∼2011.052010.07∼2011.030.321.650.3850/0.05H0.32

5East-west measuring line in working area 2301∼230723072101003.48∼3.752007.11∼2008.072006.06∼2010.080.532.350.480−0.36
South-north measuring line in working area 2301∼230723072101003.48∼3.752007.11∼2008.072006.06∼2010.080.602.250.500.42
23051201002.93∼3.422008.11∼2009.052006.06∼2010.080.502.250.50−1.32
East-west measuring line in working area 2303∼230923072101003.48∼3.752007.11∼2008.072007.12∼2011.030.652.250.500.45
23051201002.93∼3.422008.11∼2009.052007.12∼2011.030.602.250.500.27
23041201003.042009.03∼2009.122007.12∼2011.030.602.250.500.32
South-north measuring line in working area 2303∼2309230820003.57∼3.762009.10∼2010.082007.12∼2011.030.782.250.503.52
23072101003.48∼3.752007.11∼2008.072007.12∼2011.030.782.250.503.52
23061201003.3∼3.322009.09∼2010.042007.12∼2011.030.652.250.500.54
23051201002.93∼3.422008.11∼2009.052007.12∼2011.030.652.250.500.54
23041201003.042009.03∼2009.122007.12∼2011.030.652.250.500.37

6South-north measuring line in working area 4304 and 430543051201003.22008.09∼2009.022008.10∼2010.020.451.700.410−0.59
Measuring line on Jiliang highway 4304 and 430543041201003.09∼3.122009.06∼2010.062009.05∼2011.050.501.800.370−0.49
43051201003.22008.09∼2009.022008.10∼2010.020.501.800.370−0.49