Research Article

Measurement and Numerical Simulation of Ground and Subgrade Vibrations of Beijing Urban Rail Line 13

Table 4

Train passing time and train speed obtained by regression.

Record timeTrain passing time T0 (s)Slope kR2Train speed (m/s)

7 : 273.1140.08190.968424.40
7 : 343.3620.09110.996422.61
7 : 403.3450.08500.995422.72
7 : 463.9210.09480.984219.38
7 : 532.9230.10090.989426.00
10 : 323.3070.10370.972122.98
10 : 383.2430.08110.988023.43
11 : 003.7630.08020.962920.20
11 : 154.0510.05810.886118.76
11 : 253.9260.06160.907519.36