Research Article
Moisture Migration and Control of New Embankment for Reconstruction and Expansion Project in Southern China
Figure 10
Calculated flow and volumetric water storage over time: (a) flow of cross-sections S0, F0, I0; (b) volumetric water storage of cross-sections S0, F0, I0, and S0 + F0 + I0; (c) flow of cross-sections S1, F1, I1; (d) volumetric water storage of cross-sections S1, F1, I1 and S1 + F1 + I1.
(a) |
(b) |
(c) |
(d) |