Research Article
Simultaneous Operations of Pregrouting and Shaft Drilling in Shaft Construction
Figure 2
Traditional procedure for shaft sinking by pregrouting and shaft drilling. (a) Pregrouting from the surface is conducted first. (b) Shaft drilling. (c) Bedrock is excavated by the traditional D&B method.
(a) |
(b) |
(c) |