Research Article

Simultaneous Operations of Pregrouting and Shaft Drilling in Shaft Construction

Figure 2

Traditional procedure for shaft sinking by pregrouting and shaft drilling. (a) Pregrouting from the surface is conducted first. (b) Shaft drilling. (c) Bedrock is excavated by the traditional D&B method.
(a)
(b)
(c)