Research Article

Simultaneous Operations of Pregrouting and Shaft Drilling in Shaft Construction

Figure 3

Schematic map of the simultaneous operations. (a) Pregrouting for the upper bedrock. (b) Pregrouting for the lower bedrock during the simultaneous operations. (c) Bedrock is excavated by the conventional D&B method.
(a)
(b)
(c)