Research Article
Simultaneous Operations of Pregrouting and Shaft Drilling in Shaft Construction
Figure 3
Schematic map of the simultaneous operations. (a) Pregrouting for the upper bedrock. (b) Pregrouting for the lower bedrock during the simultaneous operations. (c) Bedrock is excavated by the conventional D&B method.
(a) |
(b) |
(c) |