Research Article

Simultaneous Operations of Pregrouting and Shaft Drilling in Shaft Construction

Figure 6

Layout of S-shaped grouting holes during simultaneous operations. (a) Grouting holes spaced outside the SBM. (b) Layout of grouting holes on the surface. (c) Equipment arrangement on the surface.
(a)
(b)
(c)