Research Article

Simultaneous Operations of Pregrouting and Shaft Drilling in Shaft Construction

Table 1

Designed parameters of shafts.

ParameterMain shaftAuxiliary shaftVentilating shaftWaste shaft

Designed excavated diameter7.3 m9.4 m8.5 m7.7 m

Designed effective diameter6.4 m8.3 m7.5 m5.2 m

Depth of the bottom993 m1015 m893 m1068 m

Material of the shaft wallReinforced concrete for upper alluvium, plain concrete for the bedrock

Thickness of shaft wall in the bedrock0.4 m

Designed mining level 1−962 m

Designed mining level 2−1150 m

Selected special sinking methodFreezing + pregroutingFreezing + pregroutingFreezing + pregroutingDrilling + pregrouting