Research Article
Simultaneous Operations of Pregrouting and Shaft Drilling in Shaft Construction
Table 2
Technical requirements of Cl-C grout and the clay slurry.
| Mixing proportion | Qualified Cl-C grout |
| Cement content | Dosage of water glass | Density of clay slurry | Initial funnel viscosity of clay slurry | Density | Sands content | Bleeding | Initial funnel viscosity | 100–300 kg/m3 | 10–30 L/m3 | 1.12–1.24 g/cm3 | <20 s | 1.20–1.35 g/cm3 | <5% | <5% | 50 s–80 s |
|
|