Research Article

Effect of Subway Excavation with Different Support Pressures on Existing Utility Tunnel in Xi’an Loess

Table 5

Parameters of structures of the utility tunnel.

Subject (kN/m3) (MPa)

Soil-nailed wall222.18E + 040.2
Soil nailing78.52.00E + 050.3
Cushion232.60E + 040.2
Corridor253.15E + 040.2