Research Article

Bearing Repair and Monitoring for Poyanghu Cable-Stayed Bridge

Figure 21

Stress distributions on pylons and the main girder for the repair cases (unit: tonf/m2): (a) repair scheme 1 and (b) repair scheme 2.
(a)
(b)