Research Article

Bearing Repair and Monitoring for Poyanghu Cable-Stayed Bridge

Figure 25

Continuous cable force samples of the 1# stayed cable. (a) Sample measured on 18 September (repair step 1). (b) Sample measured on 25 September (repair step 2).
(a)
(b)