Research Article
Bearing Repair and Monitoring for Poyanghu Cable-Stayed Bridge
Figure 5
Sketches for repair scheme 1. (a) 1st level repair (emergency rescue). (b) Cross section of steel channel members arranged on two sides of the bridge piers for fixing the X-shaped steel strands (unit: mm). (c) Top view of steel channel members arranged on two sides of the bridge piers for fixing the X-shaped steel strands (unit: mm). (d) 2nd level repair (bearings repair). (e) Plan view of 2nd level repair.
(a) |
(b) |
(c) |
(d) |
(e) |