Research Article

Bearing Repair and Monitoring for Poyanghu Cable-Stayed Bridge

Figure 5

Sketches for repair scheme 1. (a) 1st level repair (emergency rescue). (b) Cross section of steel channel members arranged on two sides of the bridge piers for fixing the X-shaped steel strands (unit: mm). (c) Top view of steel channel members arranged on two sides of the bridge piers for fixing the X-shaped steel strands (unit: mm). (d) 2nd level repair (bearings repair). (e) Plan view of 2nd level repair.
(a)
(b)
(c)
(d)
(e)