Research Article
Integrated Treatment Technology of Storage-Mining Inclined Goaf under Expressway
Table 5
Monitoring items, measuring point layout, and monitoring accuracy.
| Monitoring items | Monitoring objects | Measuring point layout | Monitoring instrument | Monitoring accuracy (mm) |
| Inclinometer tube | Internal deformation of strata | Inclinometer tubes laid at intervals of 100 m along longitudinal direction of route. | Inclinometer tube | 0.01 | Monitoring pile | Ground subsidence | Monitoring piles laid at intervals of 100 m longitudinally along both sides of route. | Total station and GPS | 0.5 |
|
|