Research Article

Performance of Super-Large-Span Tunnel Portal Excavated by Upper Bench CD Method Based on Field Monitoring and Numerical Modeling

Figure 8

Layout of monitoring points in tunnel portal section. (a) Layout of deformation monitoring points. (b) Layout of stress monitoring points. (c) Layout of stress test points at secondary lining.
(a)
(b)
(c)