Research Article

Risk Assessment System Based on Fuzzy Composite Evaluation and a Backpropagation Neural Network for a Shield Tunnel Crossing under a River

Table 5

Comparison of numerical simulation results with monitoring data.

ItemMeasured valueSimulated valueError

Settlement of vault (mm)11.8912.60āˆ’0.71
Surface settlement (mm)13.2210.732.49
Settlement of riverbed (mm)14.2413.730.51
Extent of plastic zone (m)2.302.50āˆ’0.20