Research Article

Analysis on Deformation and Stress Characteristics of a Multibraced Pit-in-Pit Excavation in a Subway Transfer Station

Figure 4

Plan view at the intersection of the two subway lines (a) and the two cross sections: A-A (b) and B-B (c).
(a)
(b)
(c)