Research Article

Construction Quality Control Study of Double-Layer Continuous Paving for Large-Thickness Cement-Stabilized Base

Table 10

Compaction process of double-layer continuous paving base.

PositionUsageCompaction methodRolling speed (km/h)

Lower baseInitial pressureStatic compaction 1 time1.5∼1.7
RepressOne weak and three strong1.8∼2.0
Final pressureRubber wheel 1 time2.0∼2.5

Upper baseInitial pressureStatic compaction 1 time1.5∼1.7
RepressOne weak, one strong, and three weak1.5∼1.8
Final pressureRubber wheel 1 time2.0∼2.5